Advanced products high speed jumbo bag PP flat yarn extrusion line
  • Item No.20210317ca9b3
    MOQ1 Set / Sets
    Model Number
    ZD-SPL-90/33/1000
    Output (kg/h)
    280kg/h
    description

    Advanced products high speed jumbo bag PP flat yarn extrusion line

    Banner

    Banner.jpgPerformance and characteristics

    The machine using material of polypropylene & high density polyethylene, through heating extruding 

     and drawing makes tape that is then winded for the weaving of the circular loom.

    Through our sustained improving, the machine can use 100% regenerated PP & PE, 

    powder or grain PP & HDPE to produce tapes. The screw and cylinder of extruder are of 38CrMoAlA 

    alloy steel, the hardness is over HV950 after nitrogenation treatment. Helical gear reducer made of 

    20CrMnTi alloy steel is applied to the extruder, the gears & chain wheels are made of 45# medium 

    carbon steel and done the treatment of high frequency quench. The driving rollers are plated with hard Cr, tension self-controlling of winding -rollers are applied to the driving unit. 

    The cylinder of extruder, triton and die adopt aluminum cast heater which is endurable. 

    Item\Type

    SJ-FS
    110/
    600B

    SJ-FS
    110/
    700B

    SJ-FS
    110/
    800B

    SJ-FS
    120/
    1000B

    SJ-FS
    120/
    1200B

    SJ-FS
    135/
    1600B

    SJ-FS
    135/
    1800B

    SJ-FS
    140/
    2000B

    SJ-FS
    140/
    2200B


    diameter of screw

    110

    110

    110

    120

    120

    135

    135

    140

    140

    length:diamete
    r(screw)

     23:1

    23:1

    24:1

    23:1

    23:1

    26:1

    26:1

    26:1

    26:1

    rotary speed of screw(r/min)

    25-75

    25-75

    25-75

    23-70

    23-70

    22-65

    22-65

    20-60

    20-60

    motor power of extruder(kw)

    22

    22

    30

    30

    30

    37

    37

    45

    45

    heating power of extruder(kw)

    33

    34

    36

    43

    47

    77

    80

    86

    92


    width of die(mm)

    600

    700

    800

    1000

    1200

    1600

    1800

    2000

    2200


    number of oven

    2

    2

    2

    2

    2

    2

    2

    2

    2

    power of driving motor(kw)

    5.5

    5.5

    7.5

    7.5

    7.5

    11

    11

    11

    11


    heating power
    of the oven(kw)

    15

    15

    15

    20

    24

    30

    30

    30

    30


    thickness of
    tape(mm)

    0.025-0.08

    0.025-0.08

    0.025-0.08

    0.025-0.08

    0.025-0.08

    0.03-0.08

    0.03-0.08

    0.03-0.08

    0.03-0.08

    prodrction capacity(kg/h)

    30-70

    40-80

    50-100

    60-120

    70-140

    90-180

    100-200

    110-220

    120-240

    drawing speed
    (m/min)

    50-150

    50-150

    50-150

    50-150

    50-150

    50-150

    50-150

    50-150

    50-150


    drawing rate

    4-8

    4-8

    4-8

    4-8

    4-8

    4-8

    4-8

    4-8

    4-8


    weight(kg)

    5000

    5500

    6500

    7500

    8500

    10000

    11000

    12000

    13000

    installing 
    dimensions L×W×H

    13300
    ×1250
    ×1260

    13300
    ×1350
    ×1260

    13300
    ×1500
    ×1350

    14700
    ×1750
    ×1400

    16500
    ×2050
    ×1450

    17200
    ×2600
    ×1450

    19000
    ×2950
    ×1450

    19200
    ×3400
    ×1450

    19200
    ×3500
    ×1450

    1.jpgPP woven.jpg

    More quality product

    neiye2_02.jpgneiye2_02.jpg

    Company introduction

    neiye2_04.jpg

    Exhibition certifica

    neiye2_05.jpgneiye2_06.jpg

    Packaging & Shipping

    neiye2_08.jpgneiye2_10.jpg

    FAQ

    1. How long will your engineer reach our factory?
    Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc. Prepared)
    2. How many days will you finish installing ?
    We will finish installation and training within 15 days.
    3. What should we charge for your engineer?
    You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
    4. How long is your machine's warranty period?
    All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
    5. How could you do if the parts broken within warranty?
    We would express the free replacement parts during the warranty date.
    6. How could you do after one year warranty period?
    We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
    7. Does your engineer understand English?
    Our engineers understand a little English. All our engineers have more than five years machine installation experience.
    8. Can you help us find any engineer in our location?
    Of course, we will check and inform you as soon as possible.
    9. How do we solve the machine problem after your engineer leaving?
    Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.

    Have more questions about this product?

    Scan the QR code with your phone, or visit the URL

    https://www.zhudingmachine.com/

    Have more questions about this product?
    • 288# CHUIHE RD, CHUIYANG VILLAGE, AOJIANG TOWN, PINGYANG COUNTY, ZHEJIANG PROVINCE, P.R.CHINA
    • +86-13706638598
    • [email protected]