Export Standard Low Price Non Woven Fabric Making Machinery
  • Item No.202103179fd0f
    MOQ1 Set / Sets
    description
    Banner

    Banner.jpg

    Product Description

     

    Major Characteristics :

     

    1.the whole line is well-structured and easy to operate

    2.The whole line highly automated

    3.Control elements are of well-know make ,high performance and reliable technologies 

    4.The whole line are controlled by PLC and operated with touch -scree.

    5.The allocation of the main frame and auxiliary equipment can be special designed and configurated according to customer's requirements .

     

    Production line characteristics:

     

     Product width: 1600mm

     

    Production capacity:2200T/year(According to 60g/m2, 7800h per year) Main raw material PP

     

    Product basis weight:10~200g/m2

     

    Production speed:10~300m/min

     

    Technological process of the production line:

     

    Raw  material→Pellet  feeding →Melting  and  Extruding →Filtration → Metering→Spinning→Air drawing→Web forming→Thermal calendering→straining→Rolling up→Cutting and packing121111.jpg

     

     PP Spunbond Production Line Technical Parameter :

     

    The TY OF DIE

     Effective width 

         GSM

    Annual capacity

    Embossing pattern

          1

        1600mm

      10-250GSM 

       1500T

    Diamond,oval,cross ,and line

          1

        2400mm

      10-250GSM

       2400T

    Diamond,oval,cross ,and line

          1

        3200mm

      10-250GSM

       3000T

    Diamond,oval,cross ,and line

         SS

        1600mm

      10-250GSM

       2400T

    Diamond,oval,cross ,and line

         SS

        2400mm

      10-250GSM

       4000T

    Diamond,oval,cross ,and line

         SS

        3200mm

      10-250GSM

       5000T

    Diamond,oval,cross ,and line

     

     222222222.jpg033333333333.jpg333333333.jpg

    More quality product

    neiye2_02.jpg.jpgneiye2_02.jpg

    Company introduction

    neiye2_04.jpg

    Exhibition certifica

    neiye2_05.jpgneiye2_06.jpg

    Packaging & Shipping

    neiye2_08.jpgneiye2_10.jpg

    FAQ

    1. How long will your engineer reach our factory?
    Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc. Prepared)
    2. How many days will you finish installing ?
    We will finish installation and training within 15 days.
    3. What should we charge for your engineer?
    You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
    4. How long is your machine's warranty period?
    All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
    5. How could you do if the parts broken within warranty?
    We would express the free replacement parts during the warranty date.
    6. How could you do after one year warranty period?
    We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
    7. Does your engineer understand English?
    Our engineers understand a little English. All our engineers have more than five years machine installation experience.
    8. Can you help us find any engineer in our location?
    Of course, we will check and inform you as soon as possible.
    9. How do we solve the machine problem after your engineer leaving?
    Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.

     

    Have more questions about this product?

    Scan the QR code with your phone, or visit the URL

    https://www.zhudingmachine.com/

    Have more questions about this product?
    • 288# CHUIHE RD, CHUIYANG VILLAGE, AOJIANG TOWN, PINGYANG COUNTY, ZHEJIANG PROVINCE, P.R.CHINA
    • +86-13706638598
    • [email protected]