High speed automatic jumbo bag six shuttle circular loom machine
  • Item No.20210317a4711
    MOQ1 Set / Sets
    description
    Banner
    Product Description

    Performance and Characteristics

    Wenzhou zhuding machine co ltd making Small cam and connecting rod rolling wheel transmission, which is the most
    advancedtechnology are adopted, making it easy and stable to run.
    - Rolling transmission is adopted in entire structrue instead of slide block and slide rod, which does not need lubricant and
    decreases the wearing part.
    - It's an environmental product whose noise is not more than 82dB(A).
    - Low strength plastic yarn which is made from 100% regenerated plastic can be adopted to weave.
    - It is high-efficient and energy economical. The highest rotation speed of the main motor can reach 180r/min and the power
    is1.5/2.2kw, which can save 10 thousand degree of electricity one year.
    - It is the latest type circular loom
    - As required, electronic intelligent fabric-lifting unit can be configured as well, which is featured the compensation setting
    tothe warp/weft density casually.
    Type
    S-YZJ-750/6S
    ZD-PC-4/750
    ZD-WYJ-4/750
    70-YZJ-8/2100G
    ZD-YZJ1-4/1200B
    ZD-YZJ2-4/1500B
    Number of shuttle
    6
    4
    4
    8
    4
    4
    Folding width of weaving(mm)
    300-750
    350-750
    300-750
    1400-2100
    700-1200
    1000-1500
    Max. number of warp
    720
    768
    512
    2016
    960
    1160
    Rotational speed of main motor (r/min)
    120-180
    140-180
    40-60
    40-70
    100-150
    120-130
    Production(m/min)
    1.8-2.7
    1.4-1.8
    0.8-1.8
    1-1.5
    1-1.6
    1-1.6
    Power of main motor(kw)
    2.2/3
    1.5/2.2
    2.7
    10
    2.2
    3
    Weight(kg)
    3000
    1900
    2900
    5500
    2500
    2800
    L*W*H(m)
    9.1*2.41*3.1
    8.3*2.2*2.73
    7.5*2.4*2.73
    17*3.5*4
    8.5*2.2*2.7
    8.5*2.2*2.7
    Company Information
    Shipping & Packaging
    FAQ
    1. Q:How long will your engineer reach our factory? A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared) 2. Q:How many days will you finish installing ? A:We will finish installation and training within 15 days. 3. Q:What should we charge for your engineer? A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person. 4. Q:How long is your machine's warranty period?A: All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation. 5. Q:How could you do if the parts broken within warranty?A: We would express the free replacement parts during the warranty date. 6. Q:How could you do after one year warranty period? A:We also can do service for you, but you need pay salary for our technicians 80USD/day for each person. 7. Q:Does your engineer understand English? A:Our engineers understand a little English. All our engineers have more than five years machine installation experience. 8. Q:Can you help us find any engineer in our location? A:Of course, we will check and inform you as soon as possible. 9. Q:How do we solve the machine problem after your engineer leaving? A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
    Contact Us
    Have more questions about this product?

    Scan the QR code with your phone, or visit the URL

    https://www.zhudingmachine.com/

    Have more questions about this product?
    • 288# CHUIHE RD, CHUIYANG VILLAGE, AOJIANG TOWN, PINGYANG COUNTY, ZHEJIANG PROVINCE, P.R.CHINA
    • +86-13706638598
    • [email protected]