1-1000 Sets
$50,000.00
≥1001 Sets
$10,000.00
Performance and Characteristics
(1) It adopts the most advanced plane cam and connecting rod roller to rotate, which makes the operation easy and stable.
(2)The sliding block and sliding carriage are eliminated, and the wearing parts are reduced. All the mechanisms adopt rolling transmission without lubricating oil.
(3)With automatic stop detection device for warp break, weft break and weft finish, the machine is sensitive and reliable.
(4)Environmental protection products, noise ≤ 82dB (A).
(5)The low-strength flat wire made of 100% recycled plastic is woven with high efficiency and energy saving.
(6)The maximum rotating speed of the main engine can reach 180r / min, using 1.5/2.2kw motor can save 10000 kwh of electricity in a year compared with the original four shuttle using 4kw motor.
(7)Latest developed product, model ZD-PC-4 / 750.
Type | S-YZJ-750/6S | ZD-PC-4/750 | ZD-WYJ-4/750 | 70-YZJ-8/2100G | ZD-YZJ1-4/1200B | ZD-YZJ2-4/1500B | ZD-YZJ3-4/1700B |
Number of shuttle | 6 | 4 | 4 | 8 | 4 | 4 | 4 |
Folding width of weaving(mm) | 300-750 | 350-750 | 300-750 | 1400-2100 | 700-1200 | 1000-1500 | 1200-1700 |
Max. number of warp | 720 | 768 | 512 | 2016 | 960 | 1160 | 1360 |
Rotational speed of main motor (r/min) | 120-180 | 140-180 | 40-60 | 40-70 | 100-150 | 120-130 | 120-130 |
Production(m/min) | 1.8-2.7 | 1.4-1.8 | 0.8-1.8 | 1-1.5 | 1-1.6 | 1-1.6 | 0.75-1 |
Power of main motor(kw) | 2.2/3 | 1.5/2.2 | 2.7 | 10 | 2.2 | 3 | 3 |
Weight(kg) | 3000 | 1900 | 2900 | 5500 | 2500 | 2800 | 3000 |
L*W*H(m) | 9.1*2.41*3.1 | 8.3*2.2*2.73 | 7.5*2.4*2.73 | 17*3.5*4 | 8.5*2.2*2.7 | 8.5*2.2*2.7 | 2.5*2.9*2.96 |
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Scan the QR code with your phone, or visit the URL