High speed six shuttle woven sack circular loom machine for sell
  • Item No.20210317a6df1
    MOQ1 Set / Sets
    description

    High speed six shuttle woven sack circular loom machine for sell

    Banner

    Banner.jpg

    Function introducti

     Performance and Characteristics

    (1) It adopts the most advanced plane cam and connecting rod roller to rotate, which makes the operation easy and stable.

     

    (2)The sliding block and sliding carriage are eliminated, and the wearing parts are reduced. All the mechanisms adopt rolling transmission without lubricating oil.

     

    (3)With automatic stop detection device for warp break, weft break and weft finish, the machine is sensitive and reliable.

     

    (4)The electric control adopts PLC centralized control, frequency conversion speed regulation, speed regulation is convenient and stable.

     

    (5)High efficiency and energy saving, the maximum speed of the main engine can reach 180r / min, using 2.2-3kw motor, which can save 10000 kwh per year compared with the original 4 kW motor used by six shuttle.

     

    (6)According to the user's requirements, the electronic intelligent fabric lifting mechanism can be installed, which has the functions of arbitrary setting of weft density and weft density compensation.

    TypeS-YZJ-750/6SZD-PC-4/750ZD-WYJ-4/75070-YZJ-8/2100GZD-YZJ1-4/1200BZD-YZJ2-4/1500BZD-YZJ3-4/1700B
    Number of shuttle6448444
    Folding width of weaving(mm)300-750350-750300-7501400-2100700-12001000-15001200-1700
    Max. number of warp720768512201696011601360
    Rotational speed of main motor (r/min)120-180140-18040-6040-70100-150120-130120-130
    Production(m/min)1.8-2.71.4-1.80.8-1.81-1.51-1.61-1.60.75-1
    Power of main motor(kw)2.2/31.5/2.22.7102.233
    Weight(kg)3000190029005500250028003000
    L*W*H(m)9.1*2.41*3.18.3*2.2*2.737.5*2.4*2.7317*3.5*48.5*2.2*2.78.5*2.2*2.72.5*2.9*2.96
    1.jpg3.jpg4 (1).jpg4 (2).jpg5.jpg
    More quality product

    neiye2_02.jpgneiye2_02.jpg

    Exhibition certifica

    neiye2_05.jpgneiye2_06.jpg

    Company introduction

    neiye2_04.jpg

    Packaging & Shipping

    neiye2_08.jpg

    FAQ

    1. How long will your engineer reach our factory?
    Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc. Prepared)
    2. How many days will you finish installing ?
    We will finish installation and training within 15 days.
    3. What should we charge for your engineer?
    You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
    4. How long is your machine's warranty period?
    All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
    5. How could you do if the parts broken within warranty?
    We would express the free replacement parts during the warranty date.
    6. How could you do after one year warranty period?
    We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
    7. Does your engineer understand English?
    Our engineers understand a little English. All our engineers have more than five years machine installation experience.
    8. Can you help us find any engineer in our location?
    Of course, we will check and inform you as soon as possible.
    9. How do we solve the machine problem after your engineer leaving?
    Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.

    Contact Us

    neiye2_10.jpg 

    Have more questions about this product?

    Scan the QR code with your phone, or visit the URL

    https://www.zhudingmachine.com/

    Have more questions about this product?
    • 288# CHUIHE RD, CHUIYANG VILLAGE, AOJIANG TOWN, PINGYANG COUNTY, ZHEJIANG PROVINCE, P.R.CHINA
    • +86-13706638598
    • [email protected]