1-1000 Sets
$92,000.00
≥1001 Sets
$30,000.00
This machine is suitable for printing such packing materials as poltpropylene palstic bag, glass paper and web, etc. And it is the ideal printing equipment for producing paper packing bag for food, supermarket handbag, and clothes bag etc.
Item/ Printing width | 600MM | 80MM | 1000MM | 1200MM | 1400MM | 1600MM | 1800MM | 2000MM |
Printing color | 6 colours (PC:6+0; 5+1;4+2;3+2) | |||||||
Printing width | 7.5"-40"/7.5"-50"/7.5"-60"/7.5"-70"/7.5"-80" | |||||||
Printing plate lifting system | Pneumatic/Hydraulic press control/Menu | |||||||
Mechanical speed | 100m/min | |||||||
Printing speed | 80m/min | |||||||
Anilox cylinder | Metal: 10DK-120DK (Germany) | |||||||
Register precision | Longitude:±0.25mm Transverse:±0.25mm | |||||||
Rewinder/Unwinder DIA | Φ 600mm | |||||||
Master motor (kw) | 3.7 | 3.7 | 5.5 | 5.5 | 7.5 | 7.5 | 11 | 11 |
Unwinder motor (kw) | 1.1 | 1.1 | 1.5 | 1.5 | 2.2 | 2.2 | 3.0 | 3.0 |
Rewinder motor (kw) | 1.5 | 1.5 | 2.2 | 2.2 | 3.0 | 3.0 | 3.7 | 3.7 |
Electrical header (kw) | 14 | 16 | 20 | 22 | 24 | 26 | 28 | 30 |
Blower of heater(kw) | 1.5*2 | 1.1*3 | 1.1*3 | 1.1*3 | 1.5*3 | 1.5*3 | 2.2*3 | 2.2*3 |
Blower of nature wind (kw) | 0.75 | 0.75 | 1.1 | 1.1 | 1.1 | 1.5 | 1.5 | 1.5 |
Inking motor (W) | 750 | 750 | 750 | 750 | 750 | 750 | 750 | 750 |
Master frequency converter | Panasonic/ Toshiba transducer Japan | |||||||
Bearing | Janpan (NSK) | |||||||
Unilateral bearling | ASNU(Germany) | |||||||
Weight(kg) | 4500 | 4750 | 5000 | 5250 | 5500 | 5750 | 6000 | 6300 |
Total power(kw) | 25 | 27 | 34 | 37 | 43 | 47 | 55 | 58 |
Dimension(L*W*H)m | 4.8*1.8*2.8 | 4.8*2.0*2.8 | 4.8*2.2*2.8 | 4.8*2.4*2.8 | 4.8*2.6*2.8 | 4.8*2.8*2.8 | 4.8*3.0*2.8 | 4.8*3.2*2.8 |
1. How long will your engineer reach our factory?
Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc. Prepared)
2. How many days will you finish installing ?
We will finish installation and training within 15 days.
3. What should we charge for your engineer?
You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 80USD one day per person.
4. How long is your machine's warranty period?
All our machine have one year guarantee for electricity parts and two years guarantee for mechanism, starting from finished installation.
5. How could you do if the parts broken within warranty?
We would express the free replacement parts during the warranty date.
6. How could you do after one year warranty period?
We also can do service for you, but you need pay salary for our technicians 80USD/day for each person.
7. Does your engineer understand English?
Our engineers understand a little English. All our engineers have more than five years machine installation experience.
8. Can you help us find any engineer in our location?
Of course, we will check and inform you as soon as possible.
9. How do we solve the machine problem after your engineer leaving?
Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Scan the QR code with your phone, or visit the URL